MSB School District Assembly Room

A $782,000 renovation of an existing 5,000sf school gymnasium into the new School District Assembly chambers and training area. The 43,460sf existing building had previously been converted into the Administration Building for the District. The Gymnasium was being used for storage and makeshift conferences. This renovation provided a cost‐effective and energy efficient retrofit to the existing space. The building’s sustainable features include reusing the existing building shell, adding insulation to the envelope (was R7, now R25), re‐used cabinets, recycled content products, acoustic design, energy efficient lighting with occupancy controls, efficient plumbing fixtures, and renovations and enhanced controls to the mechanical ventilation units. The retrofit provides an annual energy cost savings of 30%.